MIXED-USE · STRIP DISTRICT · 2025
(SMALLMAN
ST.)
6 storeys, 84 apartments over 18,000 sq ft of retail. Steel frame, brick and limestone skin.
CLIENT
Mercer Development
VALUE
$38M
SIZE
142,000 sq ft
SCHEDULE
19 months, 2 weeks early
STEEL
412 tons, erected in-house
SAFETY
0 lost-time incidents
A RAIL YARD BECOMES A STREET.
The site was a former produce rail spur with a 1920s retaining wall nobody had drawings for. We scanned it, underpinned it, and kept it as the base of the retail floor. The frame went up in fourteen weeks with our own ironworkers; the brick is from the same Ohio kiln as the 1920s warehouses next door.


NEXT PROJECT
ALLEGHENY COLD STORAGE
BEFORE / AFTER.
Drag the torch to see this site before and after the build.

BEFORE
HANDED OVER